What is User Acceptance Testing (UAT)? How I run it with my squad

How I own UAT on the business side, from use cases and acceptance criteria to a structured, role-tailored testing approach across the squad.

Published

User Acceptance Testing (UAT) is the final check before a feature goes live: validating, from the perspective of the actual business, that what was built genuinely does what it was meant to do — not just that the code works, but that it solves the real use case. It’s a business-side responsibility, distinct from technical QA, and it’s easy to do badly: run too late, too vaguely, or by the wrong people testing the wrong things.

How I own UAT on the squad

I set up and coordinate UAT on the business side for everything my squad ships. That starts upstream, not at the end: I document business requirements, user stories, and acceptance criteria as a firm foundation before development even begins, so “acceptance” is defined in advance rather than improvised once a feature is built. I then plan and run the acceptance testing myself, through to final sign-off, before anything goes live.

A structured, role-tailored approach

Testing everything the same way, with everyone testing everything, doesn’t scale and doesn’t catch the right issues. With my squad, we’ve defined a clear, structured approach that gives each member their own testing boundaries, tailored to their role and expertise — rather than duplicating effort, each person validates the parts of a release closest to what they actually own. That structure is what makes it realistic to run thorough UAT consistently, release after release, rather than it becoming a bottleneck squeezed in at the end.

This discipline is what stands behind every feature this squad has shipped, from the AI-powered cross-selling engine to the PIM data migration — nothing goes live without going through it first.

FAQ

What is User Acceptance Testing (UAT)?
The final check before a feature goes live: validating from the business side that what was built genuinely solves the real use case, not just that the code works.
Who should run UAT — the business or QA?
QA checks the code works as specified; UAT checks it solves the real business use case. UAT should be owned and run by the business side, not treated as an extra QA pass.
When should UAT be planned — before or after development?
Before. Acceptance criteria should be documented alongside business requirements and user stories before development starts, so "accepted" is defined in advance rather than improvised once a feature is already built.